Helge Tiainen: Fiber Access Extension Eases Connectivity Worries for Operators, Landlords and Tenants

Previously, tenants living in the United Kingdom’s estimated 480,000 blocks of flats and apartments had to wait for a landlord’s permission to have a broadband operator enter their building to install faster connectivity. But that is no longer the case.

At the beginning of the year, a new UK law change meant that millions of UK tenants are no longer prevented from receiving a broadband upgrade due to the silence of their landlords. The Telecommunications Infrastructure (Leasehold Property) Act allows internet service providers to access a block of flats 35 days after the ISP’s request to the landlord. It is estimated that an extra 2,100 residential buildings a year will be connected as a result.

Broadband companies have advised that currently around 40 percent of their requests for access to install connections in multi-dwelling units are delayed or blocked, due to no landlord response. Undoubtedly, tenants residing in these flats and apartment blocks are those most effected by a lack of accessibility to ultra-fast connectivity. So, how can ISPs grasp this newfound opportunity?

Harnessing the existing infrastructure

For many ISPs, MDUs pose a market that is largely untapped in the UK. Why is this? Well, for starters, typically these types of properties present logistical challenges, and are lower down in the pecking order in terms of the low hanging fruits readily available when it comes to installing fiber to the premises. The more attractive prospects are buildings in densely populated areas that can be covered easily with gigabit broadband.

Whereas, MDUs have typically been those underserved. Signing a broadband contract with a customer in a single-family unit is easier than an MDU as it involves securing permissions from building and apartment owners for construction works, as well as numerous tenants. For those ISPs tasked with upgrading tenants’ existing broadband connections, there are other challenges prevalent such as rising costs, wiring infrastructure changes and contract requirements, including minimum take-up rates.

So, there has been no better time to use the existing infrastructure readily available within the property. A fiber-only strategy can be supplemented if fiber to the extension point is employed where necessary. A multi-gigabit broadband service can be delivered at a lower cost and reach more customers over existing infrastructure for a short section of wire leading to the customer premises and inside the premises.

Bringing gigabit connectivity floor to floor

The UK government hopes that 85% of the UK will be able to access gigabit fixed broadband by 2025. However, installing fiber to every flat can be a challenge that is expensive, labor-intensive and disruptive to customers. Landlords may be hesitant to grant permissions due to the aforementioned reasons and potential cosmetic damage caused. Historically, fiber deployments in MDUs can be as much as 40% of fiber to the building deployment costs.

MDU buildings have existing coaxial networks, and reusing this infrastructure is a tangible possibility and time-saving alternative for ISPs instead of installing fiber direct to the premises. Which can be costly if the take-up rate is low for new services. The coaxial networks in MDUs can be used in an innovative way as in-building TV networks are upgraded to support higher frequency spectrums thanks to the analogue switchover to digital TV services.

ISPs can potentially opt to use fiber access extension technology for a cost-effective and less complex upgrade of broadband as it utilizes the existing in-house coax cable infrastructure. The technology provides multi-gigabit broadband services, positioning it as a clear frontrunner when optical fiber cannot be deployed due to construction limitations, a lack of ducts, building accessibility, and technical or historical preservation reasons.

Time for change

Not only does this landmark new law allow ISPs to seek rights to access a flat or an apartment if the landlord required to grant access is unresponsive, but it also prevents any situations where a tenant is unable to receive a service simply due to the silence of a landlord.

This is a crucial opportunity to reuse existing infrastructure for broadband access as TILPA enables subscribers and service providers to circumvent landlords who fail to provide access permission.

As many ISPs look to seamlessly execute their fiber deployment strategies, using cost-effective solutions can accelerate the addressable number of subscribers and allow for a major return on investment.

As head of product management, marketing and sales at InCoax, Helge Tiainen is responsible for developing sales and marketing of existing products and new business opportunities among cable, telecom and mobile operators by developing use cases and technologies within standard organizations as Broadband Forum, MoCA, Small Cell Forum and other working groups. He also manages partnerships of key technology partners suited with InCoax initiatives. This piece is exclusive to Broadband Breakfast.

Broadband Breakfast accepts commentary from informed observers of the broadband scene. Please send pieces to commentary@breakfast.media. The views reflected in Expert Opinion pieces do not necessarily reflect the views of Broadband Breakfast and Breakfast Media LLC.



Source

Originally posted on February 2, 2023 @ 11:04 pm